HDB KITCHEN 2 TOILETS PACKAGE @ $19,888

PRELIMINARIES
1. Submission to HDB for renovation works (exclude PE endorsement)
2. To provide labour / material for 1 trip Chemical cleaning for Kitchen 2 Bathroom
3. Clearing of Debris,Supply of Sand,Upload of materials
4. Floor protection by corrugated fiberboard
5. Provide Living, Kitchen and Master Bedroom 3D Drawings

HACKING WORKS
1. Hack off existing floor and wall tiles at Kitchen and 2 Toilets
2. Dismantle 2nos. of existing 2 Toilets Doors
3. Hack off existing toilet WC, basin and accessories at 2 Toilets
4. Dismantle all Kitchen Cabinet, Kitchen Sink, Hood and Hob at Kitchen

MASONARY WORKS
Kitchen
1. Construct kitchen mortar base and fridge base complete with Side tiles
2. To supply labour & material to lay 2-Step K-11/104 water proofing
3. To Supply Labour to do cement screeding for Kitchen Floor
4. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles
at kitchen. (<$2.80) Not more than 240 sqft inclusive Wastage
>excluding : Borders/Special Tiles

5. Supply Labour to do cement screeding for Kitchen Wall
6. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles
at Kitchen Wall. (<$2.40) Not more than 480 sqft inclusive Wastage
>excluding : Borders/Special Tiles

Master Bathroom
1. To supply labour & material to lay 2-Step K-11/104 water proofing
at Master Bathroom Floor
2. To supply labour to do cement screeding for Master Bathroom Floor
3. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles
at Master Bathroom. (<$2.80)
>excluding : Borders/Special Tiles

4. Supply Labour to do cement screeding for Master Bathroom Wall
5. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles
at Master Bathroom. (<$2.40) Not more than 250 sqft inclusive Wastage
>excluding : Borders/Special Tiles
6. Construct Shower kerb/Step Down/Ramp at Master Bathroom
7. Construct Entrance kerb/Step Down/Ramp at Master Bathroom Entrance

Common Bathroom
1. To supply labour & material to lay 2-Step K-11/104 water proofing
at Common Bathroom Floor
2. To Supply Labour to do cement screeding for Common Bathroom Floor
3. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles
at Common Bathroom. (<$2.80)
>excluding : Borders/Special Tiles

4. Supply Labour to do cement screeding for Common Bathroom Wall
5. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles
at Common Bathroom. (<$2.40) Not more than 250 sqft inclusive Wastage
>excluding : Borders/Special Tiles
6. Construct Shower kerb/Step Down/Ramp at Common Bathroom
7. Construct Entrance kerb/Step Down/Ramp at Common Bathroom Entrance

CARPENTRY WORKS
(To design, fabricate and install using High Pressure solid ply-wood, laminated finishes, soft closing hinges for casement door,ABS door trimming, internal white color PVC)

Kitchen
1. Design and fabricate (L) 10 FT Bottom and (L) 10 FT Top Kitchen Cabinet
W/ free soft close hinges for Cabinet Door
* kitchen carpentry uses high pressure solid plywood c/w laminate finish, ABS trimming
* free soft close hinges & full retractable drawer runner

SOLID SURFACE
Kitchen Top
1. Supply labour & material to install Solid Surface at Kitchen Top c/w Back splash ( 10 ft )

PLUMBING WORKS
Kitchen & 2 toilets
1. Supply labour to install Stainless Steel piping at Kitchen and 2 Toilets
2. Supply labour to install 2nos of Instant heaters
3. Supply labour to install toilet accessories at both bathroom
4. Supply labour to install 2nos of WC in Both Bathroom
5. Supply labour to install 2nos of Basin and Taps in Both Bathroom
6. Supply labour to install 2nos of Spray Gun in Both Bathroom
7. Supply labour to install 1 set of Kitchen Sink and Tap at Kitchen

ALUMINIUM
2 Toilets
1. Fabricate and install 2nos of (L) 3 FT X (H) 7 FT Bi-Fold Door in Master Bathroom

PAINTING WORKS
1. Supply labour and materials using NIPPON PAINT to paint Kitchen and 2 Toilets Ceiling and WC Piping